Major ongoing projects


Facilitating the National Hazardous Waste Centre in Bulgaria

A project involving several components for facilitating the National Hazardous Waste Centre is conducted in 2003-2005 financed by DANCEE. This project also include development of a ... 
 Read more

Integrated Decontamination and Rehabilitation of Buildings

The objective of this project is to develop and implement a general “City Concept” comprising a toolbox of improved technologies and processes, together with decision making and management ... 
 Read more

Support to the Marine Protected Area Network in Vietnam (MPA)

Project aiming at creating a sustainable management of marine and coastal natural resources in a national protected area system. ... 
 Read more

Reclamation of land contaminated by munitions-related activity

The objective of this project (EUCLID RTP 14.12) is to conduct a study on practical, safe and cost-effective solutions for the clearance and subsequent reclamation of land contaminated by munitions... 
 Read more

Protection of camps out-of-area

The objective of this project (EUCLID RTP 3.24) was to develop a new shelter system for military camps, which can be used, for example, in peace-keeping operations. These camps must be quick to set... 
 Read more

Denmarks Radio City, Newscentre

Floor area: 30,000 m² Construction costs: 391 million DKK The major part of Segment 2 included news and sports studios and offices, and the emphasis was on creating a modern, fle... 
 Read more

Fire safety consultancy on Denmarks' Radio

Performance-based fire safety analysis for the construction of Denmarks' Radio concert hall. ... 
 Read more

Geotechnical investigations

Geotechnical investigations concerning the construction of the Denmarks Radio concert hall. ... 
 Read more

Denmarks Radio, Concert Hall

The 22,000 m² large concert hall fulfils international standards both in terms of music and architecture. The concert hall will be optimised for classic concerts, but will allow other types... 
 Read more

Urban environmental management in five municipalities

Technical assistance to the preparation and implementation of 5 year rolling Municipal Environmental Action Plans for five cities, including review of by-laws and revi... 
 Read more

Wang watershed management

Technical Assistance to the EC suppport to the Wang Watershed Management Services rendered: strengthen capabilities within the RNR sector to develop and implement sustainab... 
 Read more


 Top